Montreal Olympic Stadium: Industrial Design for Tower Renovation

EMART Design participates in the Montreal Olympic Stadium renovation project in collaboration with Boris Basse and TECHNIVERRE INC.

The work involves the design of attachments for glass balconies at the top of the tower, with 3 m high inclined glazing.

This intervention in industrial design includes the search for solutions, the integration of technical constraints, the realization of sketches, 3D renderings and technical plans.

Contact form

Share

LinkedIn
Facebook